• <nav id="rkuv8"></nav>

      1. <sub id="rkuv8"><listing id="rkuv8"></listing></sub>

        Today is: 2021 Year 9 month 4 Day  Saturday
        Chinese | English
        Headquarters address: Yancheng City Liberation Road No. 58 building 19 layer
        Phone:+86-15161989891( Ms kelly)
        Tel:0086-515-88580266
        Fax:0086-515-88580229
        E-mail:sales@kingmachine.cn
        Web:www.motornizate.com
        News Center>Technical exchanges
        您現在的位置: 首頁 >> 新聞中心
        The installation instructions for ESP
        2014/5/9 閱讀次數:[1817]
        1, applicable scope
        L.1 this specification is applicable to electrical precipitator installation. With reference to the implementation of technical renovation, overhaul or.
        Special provision 1.2 same type electric precipitator and some products are inconsistent with the specification, according to special provisions.
        1.3 normative references
        JB / T5910 - 1997 electrical precipitator
        JB / T8536 - 1997 electrical machinery dust collector mounting technology
        JB5908 - 1991 electric dust remover main sampling inspection and packaging and transportation storage specification
        JB / T5906 - 1997 electric dust collector anode plate
        JB / T5909.l 4 ESP porcelain insulator
        2, equipment storage and acceptance
        2.1 the equipment arrived at the scene, according to the following requirements for safekeeping.
        2.1.l yard to the rational distribution, solid foundation, for shipment, assignments, and prepare for flood and waterlogging prevention facilities.
        2.1.2 products to meet the pre stack and installation process requirements, avoid repeated unlucky to prevent deformation.
        Regulation of 2.1.3 ESP parts packaging and transportation, storage, marking shall be in accordance with JB5908 - 1991.
        2.2 equipment acceptance
        2.2.1 equipment out of the box, checking, approval shall be factory, user, the construction unit to participate in the.
        2.2.2 acceptance conditions
        A. supply technology file list, packing list and other documents;
        Match design models, B. equipment nameplate on the specification, quantity and engineering;
        C. to check the quality of products, such as transportation, loading and unloading, storage process of deformation and size change, should be corrected, to scrap and replacement of not repair to;
        On the basis of D. equipment acceptance standard manufacturers design drawings, technical documents and JB / T59lO 1997 provisions.
        3, the preparation before construction
        3.1 installation unit should be familiar with the equipment structure, performance, design drawings and relevant technical documents, the preparation of construction organization design documents and construction quality, construction process to make strict quality inspection record.
        3.2 according to the requirements of construction organization design, site formation, platform installation, lifting machinery, special equipment etc..
        3.3 porcelain products pressure test shall comply with JB/T5909.l 4 provisions.
        3.4 factory equipment technical disclosure, to technical guidance to the construction period when necessary.
        4, electric precipitator installation
        4.1 installation sequence of ESP: because of the ESP is a large outdoor equipment, the installation site and conditions vary, the construction unit of the personnel and equipment conditions are not the same, so the construction unit can according to the following we provide common electric precipitator installation sequence selectively construction.
        An article: Bag dust collector installation instructions   Next: Wet electrostatic precipitator: is China a piece of blue sky
        Home | About Us | News | Products | Case | Human resources | Network | Customer Service
        Copyright:Jiangsu Tandge Environmental Engineering Co., Ltd.
        Headquarters address: Yancheng City Liberation Road No. 58 building 19 layer Phone: +86-15161989891(Ms kelly)
      2. <nav id="rkuv8"></nav>

          1. <sub id="rkuv8"><listing id="rkuv8"></listing></sub>

            亚洲高清国产拍精品青青草原_范冰冰张开腿被老外桶视频_日韩欧美亚洲每日更新在线_gv天堂永久网站